Wednesday, 2 December 2009

Mon 7th Dec...

Just incase people haven't read their e-mails this is what needs to be done by mon:

Photographs/turn arounds for completed Reverend puppet
Photographs/turn arounds for completed Prof T. puppet
Photographs/turn arounds for completed Mattord puppet
Photographs/turn arounds for completed Razor puppet
Photographs/turn arounds for completed Captain Bliss puppet
Photographs/turn arounds for completed BILL/Ogre puppet


Finished Hut set

Finished Boat / engine set

Finished foliage / trees / bushes etc for replacement in shots

At least One Walk Cycle or Shot for each of the Main characters

Each animator should do at least 1 animation with the chacaters

Photographs / turn around for all characters lined up with correct costumes / hats / instruments

After Effects compositions for each shot…with correct length, aspect ratio

As much animation as possible so it can be added to the animatic.

Each Animator must have copies of the current (dated) schedule, animatic



It would be good to see everyone tomorrow to talk this over and sort out jobs for the weekend. if possable we need the armatures by friday so that everyone can have a go at animating before monday, i don't know what facilities for stop motion everyone has at home, but i'm assuming we won't be able to animate over the weekend.

the armatures are coming along well most of the heads have been sculpted now and steven started on the hands today, which were lookin really good. i'm still a bit hazy on the feet front but i think we are goin for Ben's disign.

we'll go through the rest tomorrow.

~Dave

No comments:

Post a Comment